Founded in 2005, APRO Innovation Limited is a high-tech enterprise specializing in industrial air treatment and liquid cooling solutions.

CEE Support

cee
greenhouse ventilation unit control box
CEE Agricultural Ventilation Support

CEE Support for Agricultural Ventilation Projects

APRO supports agricultural ventilation projects that need CEE-related product documentation, technical coordination, and equipment matching for greenhouse and agricultural building applications.

For buyers in France and other European markets, CEE project preparation is not only about choosing a product. It also requires clear equipment information, suitable application matching, project documents, installation conditions, and communication with local project partners.

APRO helps greenhouse contractors, agricultural project companies, distributors, and energy transition project teams prepare the right ventilation equipment information before ordering.

APRO industrial double flux controlled mechanical ventilation systems are positioned for agricultural greenhouse ventilation and heat recovery applications related to AGRI-TH-119 project needs.

APRO electric distribution and control cabinets support ventilation system control and are listed in APRO materials with CEE AGRI-EQ-101 compliance. Buyers should confirm final use with their local project advisor.

All You Need To Know About CEE

Professional support for your agricultural ventilation projects under the CEE scheme.

CEE Compliance

Meet all CEE requirements with confidence

Technical Support

Expert advice on product selection and systems

Project Documents

Complete documentation for your projects

Dedicated Service

Responsive support from our experienced team

cee ventilation applications greenhouse farm livestock
cee greenhouse ventilation unit outdoor installation
cee ventilation control cabinet greenhouse fan
cee greenhouse before after ventilation airflow
cee
greenhouse ventilation control system diagram

What Is CEE?

CEE, or Certificats d’Économies d’Énergie, is a French energy-saving certificate mechanism designed to support energy efficiency projects.

For agricultural projects, some standardized operation sheets are related to greenhouse energy saving, ventilation, dehumidification, temperature integration, and heat recovery applications.

In simple terms, CEE-related projects usually need three things:

  • A suitable application scenario
  • Equipment that matches the project requirements
  • Correct documentation and installation confirmation

 

APRO supports buyers with equipment information and technical communication for CEE-related agricultural ventilation projects.

How APRO Supports Your CEE Project Preparation

1. Product Selection Support

Tell us your greenhouse size, airflow requirement, application type, voltage, and project location. APRO can help check the suitable ventilation unit and control cabinet direction.

2. Technical Document Support

We can provide available product information, model options, airflow capacity, control requirements, and basic technical documents for project communication.

3. Equipment Matching Support

For ventilation machines and control cabinets, APRO helps buyers check matching requirements before order confirmation.

4. Project Communication Support

We support overseas buyers during the inquiry, quotation, and order confirmation stages, helping reduce misunderstanding and communication delays.

cee ventilation process flow diagram
cee greenhouse ventilation project checklist

Contact Us

Have a question or need a sample? Leave your message — our team will respond promptly with detailed information for your project.

Get A Quote

Get a fast, accurate quote directly from our factory. No middlemen, no hidden costs — just efficient service and reliable pricing.